Results 1 to 7 of 7

Thread: sync between 2 led controllers

Hybrid View

  1. #1
    Join Date
    Mar 2007
    Location
    Russia
    Posts
    33
    You can sync your screens only with an external device. We use the Datapath x4. You connected onle one DVI to Catalyst on Datapath, use one submix. And the output x4 is sent to the transmitting sender card(not scree processor input!). The datapath is necessary to put the same resolution and frequency at the output(for sync). If your sender card is understood signal triple2go you can use it. It is cheaper.
    Nosce te ipsum

  2. #2
    Quote Originally Posted by test View Post
    You can sync your screens only with an external device. We use the Datapath x4. You connected onle one DVI to Catalyst on Datapath, use one submix. And the output x4 is sent to the transmitting sender card(not scree processor input!). The datapath is necessary to put the same resolution and frequency at the output(for sync). If your sender card is understood signal triple2go you can use it. It is cheaper.
    Hi test, thank you for your answer.

    The output of the datapath are frame locked each other (green led) and also the input is frame locked with the output.

    At the moment I'm using two keystone submix in offset, one for the left part and one for the right part. So its better to use only one submix spanned to the two datapath output?

    Time ago I had a similar problem of sync with SDI camera input but that time I was using only one output of the datapath splitted to the two led controller.
    2015-09-22 10.48.31.jpg. Also that time 25fps video was in perfect sync but SDI camera were not. So maybe its not a problem of datapath output sync

Similar Threads

  1. General controllers guide
    By test in forum Catalyst Technical support
    Replies: 11
    Last Post: 25-02-2015, 09:03 AM
  2. Sync
    By efxmaster in forum Catalyst Technical support
    Replies: 3
    Last Post: 17-08-2011, 11:59 PM
  3. Nice USB button controllers
    By Barney Broomer in forum Technology questions
    Replies: 0
    Last Post: 15-05-2005, 06:23 PM
  4. Sync via MTC
    By jasonrudolph in forum Catalyst Technology questions
    Replies: 3
    Last Post: 21-04-2005, 12:50 PM
  5. Sync ID
    By Bullen in forum Catalyst Software
    Replies: 16
    Last Post: 01-04-2004, 07:03 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •